PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

1st floor Detention cell divider wall Facing West.jpg Block work at the Sally Port Facing West.jpg Installing copper piping at the 1st floor locker room 133-136Facing North-West.jpg Started installing copper piping at the 1st floor locker room Facing West.jpg Aligning the stone panels at the 3rd floor Facing North.jpg Aligning the stone panels at the lower roof Facing East.jpg Duct work fitters at the 3rd floor Facing West.jpg Framing aound the column at the 2nd floor Facing north.jpg Installing copper piping at the 2nd floor Facing South.jpg
Previous pageNext page Aligning the stone panels at the 3rd floor Facing North
Aligning the stone panels at the 3rd floor Facing North